Work Progress – Message from our President

March 16, 2017:

So another quiet weekend. Here’s what happened:

  1. Unloaded the first batch of new super heaters and got them under cover.
  2. Loaded some more tubing on Gary O’s trailer so he could continue on with the build. That was actually somewhat of a Chinese fire drill, because stuff had been stacked up around where the tubing was placed – High centered the fork truck a couple of times – tried to get it stuck – finally had to move some stuff and drag the tubing into a position where I could pick it up.
  1. Held a board meeting on Sunday and welcomed two new board members – Randy Woehl and Mark Siegel (actually a returning board member). Jeremy Klitzke stepped down.

Thaz all. They we all went home before we began to rust.

 

Charlie


Leave a Reply