Flue Tube Installation Prep Has Begun

A lot is happening at the engine house this week and it is quite exciting. The crew is setting up and staging everything to begin installing the flue tubes. This includes cleaning the front flue sheet as shown here in this photo by Mark Siegel. The scaffold is being set up, tubes are being delivered and stacked, and a tube heating and cutting area is being created.

Let’s Make Steam Happen in 2020!


Leave a Reply