“We had a very productive Monday. We stuffed the first super heater unit of the second row as a test fit – slid right in. You can see the differences from the first row to the second, namely the bifurcates on the down pipes. We also removed all the threaded pipe fittings from the soon to be replaced steam lines under the boiler jacket. And we had an engineering rep from Albina Pipe bending on site to inspect the sample lines in response to our request for pricing.” – Matt B.
Photos by: Matt Baccitich