Work Progress – Two Updates From Our President

2/24/17:  “So, Saturday, we pressed on with ultra-sounding. Not very exciting…not very dramatic…tedious,  actually. But Randy W. and Kyle C. keep plodding along. At the same time, Devin R. helped out exposing some pipe for inspection and cleaning around. On Monday, the tube crew continued on removing those flues and tubes that have to come […]

Ultrasound Prep

2/18/17:  Steve R. prepping the engine for more ultrasounding. This is to remove any rust or debris so that ultra-sounding can be performed on the bare metal. Photo by Randy Woehl

Flue Tube Removal Continues

Kyle Chappell and Randy Woehl taking aim with the sledge in the combustion chamber to drive the flues out after the tubes were cut.

Update from the PRPA President

February 9, 2017:  “So, last Saturday no work occurred on the engine, because a light show hosted by the ORHC was still in progress and we could not get to the engine without disturbing it. However, Matt B and several others did have a “Last Monday” during which they made further progress removing tubes and […]